KARACHI - Emirates SkyCargo and Gerrys Dnata Lahore team successfully managed oversized cargo of 15,000 kg aboard EK 8740 arriving on a Boeing 747 freighter (B747F) from Frankfurt. The consignment included Diesel, Heat Recovery Steam Generators and Steam Turbine Generator among supporting infrastructure for a Heavy Fuel Oil- Fired Diesel Engine Generating Power Facility, as well as auxiliary components and fittings for a Power Plant. This 45 feet long consignment was off-loaded through the nose of B747F using two high loaders and was managed safely on the ground in a record ground time of 50 minutes.